look what we did!

Category: Architecture, Innovation Bonds

Polyurethane Cuts Statue Manufacturing Time in Half

An art studio that designs and manufactures statues worldwide has recently been making use polyurethane products. Its typical manufacturing process takes 6 to 8 weeks; however, since the integration of Alchemie’s PU 3676, statues are being completed in as little as 2 to 3 weeks.

PU 3676 is a low viscosity, two-component polyurethane system that can be used to produce patterns, molds, models and prototypes with excellent fine-detail replication. PU 3676 can be filled with mineral or metallic fillers for reduced shrinkage and has rapid demold times even when cast in thin sections. That’s truly incredible!