Buddhas are packaged in foil and ready for export
Polyurethane Cuts Statue Manufacturing Time in Half
An art studio that designs and manufactures statues worldwide has recently been making use polyurethane products. Its typical manufacturing process takes 6 to 8 weeks; however, since the integration of Alchemie’s PU 3676, statues are being completed in as little as 2 to 3 weeks.
PU 3676 is a low viscosity, two-component polyurethane system that can be used to produce patterns, molds, models and prototypes with excellent fine-detail replication. PU 3676 can be filled with mineral or metallic fillers for reduced shrinkage and has rapid demold times even when cast in thin sections. That’s truly incredible!
Category: Architecture, Innovation Bonds